Showing posts with label ETAP. Show all posts
Showing posts with label ETAP. Show all posts

Saturday, September 3, 2016

Power System Study of 3x135 MW CFB Thermal Power Plant FDCMPC

Our freelancer has undertaken Power System Study for 3x135 MW CFB Thermal Power Plant of FDCMPC in Cagayan De Oro, Misamis Oriental in the Philippines. The scope of the project are Load Flow, Short Circuit Analysis and Motor Starting Analysis.